|
|
SPALLS AT PREMOLDED EXTERIOR JOINTS 1. Cut out spall too minimum depth of 3/4", 1" if possible.
2. Remove premolded filler and concrete laitance to approx. 1 to 1 1/2" depth.
Form a barrier by applying tape or sand to separate filler from MM-80 .
3.Mix MM-80 then add 2 1/2" parts silica sand. Install flush.
|