To effectively protect joint edges against spalling, a filler must be flush with the floor surface and held in place sufficiently firmly to support imposed wheel loads. If you find that the filler was originally placed flush but is now seated below the surface, or drops below the surface under load, the filler must be corrected. The means of correction will depend upon the cause of the recess.
TYPICAL CAUSES AND
CORRECTION A. A compressible backer rod was used below the filler. B. The filler was placed over dirt and debris. C. Too much sand was used
and was not absorbed by the liquid filler.
CORRECTION: The only solution is to totally remove the filler and all other material/debris in the joint. After thoroughly cleaning the joint it should be properly refilled in accordance with published instruction sheets. Any edge spalling that has occurred should be corrected at the same time (see repair sheets R1, R2).
CONSTRUCTION JOINTS
(FLUSH BULKHEAD FORMED) A. The filler depth was less than the 2" specified in our literature and lost its bond to the joint wall. B. The joint opening was
so great that the filler lost bond.
CORRECTION: The best correction is to totally remove the existing failed filler and replace with new filler a minimum of 2" deep. A second option is to use the existing filler as a base for the new filler. This method should be used only if the filler can be driven down deep enough to make room for 1 1/2" of replacement filler.
PRECAUTIONS ON
CORRECTION Treat the correction as you would joints on a new project. Follow all published instructions and Metzger/McGuire Repair Sheets.
|