TECH DATA
1. Product Name
SPAL-PRO RSF
2. Manufacturer
METZGER/McGUIRE
P.O. Box 2217 CONCORD, N.H. 03302 (U.S.A.)
TOLL-FREE: (800) 223-6680 • PHONE: (603) 224-6122
FAX: (603) 224-6020 • E-MAIL: specmm80@aol.com
Web Site: www.metzgermcguire.com
3. Product Description
Composition
Spal-Pro RSF is a rapid setting, two-component polyurea polymer liquid of 100%
solids content. When cured, Spal-Pro RSF is a gray, rubberlike solid
with a hardness of Shore A85-94, depending on temperature.
Basic Use
Spal-Pro RSF was developed to fill and protect joints in freezer room concrete
floors that are subject to hard wheels and heavy loads. Its primary
function is to support such traffic and support joint edges. Spal-Pro
RSF is designed for use in areas where final temperatures are from 32°F (0°C)
to -25°F (-32°C).
Other Uses
Spal-Pro RSF is also ideal for filling random cracks in freezer floors.
4. Limitations
• Spal-Pro RSF should be installed only after installation areas are
stabilized at final operating temperatures. Due to its relatively high Shore A
hardness it will not expand if joints widen considerably as temperatures drop.
• Spal-Pro RSF is not recommended for the repair of wide (1"+) spalled
joints, wide gouges or surface delamination. Refer to data on Spal-Pro
2000 for such repairs.
5. Correct Joint Design/Installation
Spal-Pro RSF should be installed full depth in saw-cuts and 2" (50 mm)
deep in construction (formed) joints that are not saw-cut, per PCA and ACI
guidelines. Because of its rapid set, "choking off" the base of the
joint is normally not necessary. If shrinkage crack is excessive, it may
be "choked off" as shown below (contractor's option). Do not use
compressible backer rod (Ethafoam, etc.) in saw cut joints. Compressible
rod may be used 2" down in formed joints.
TECHNICAL INFORMATION
TEST METHOD RESULTS
HARDNESS, SHORE “A” @ 0°F D-2240
A92-94
HARDNESS, SHORE “A” @ 60°F D-2240
A85-87
TENSILE STRENGTH
D-638
930 PSI
TENSILE ELONGATION*(@60°F) D-638
170%
ADHESION TO CONCRETE
D-4541
350-400 PSI
TACK FREE @ 0°F
-
1 Hour
LIGHT TRAFFIC READY @ 0° F
-
2 Hours
FULL TRAFFIC READY @ 0° F
-
3 Hours
MIX RATIO (by vol.)
-
1:1
SOLIDS CONTENT
-
100%
SHRINKAGE
-
Negligible
6. Color and Packaging
Standard color is medium (charcoal) gray. Available in 10 gal. (US) kits
(2-5 gal. US pails), 100 gal. (US) kits (2-50 gal. US drums), and
dual-cartridge convenience kits.
7. Applicable Specifications
There are no government or ASTM standards for floor joint fillers.
Spal-Pro RSF meets and/or exceeds the floor joint filler guidelines set
forth by ACI 302 (Guide for Concrete Floor and Slab Construction, ACI report
302.1 R-96), ACI 360 and PCA (Concrete Floors on Ground, Ralph E.
Spears, PCA).
8. Advantages
• Spal-Pro RSF is Rated "Heavy Duty"
Unlike flexible polyureas, RSF's higher shore
hardness
provides greater edge protection and support.
• Spal-Pro RSF is "Rapid-Setting"
At 0°F (-18°C) it can be opened to full traffic in
as little as
(3) three hours and light traffic in (2) two hours.
• Spal-Pro RSF Will Not Become Brittle
Even at temperatures far below freezing, RSF retains its
hard, rubberlike character.
• Spal-Pro RSF is a "Superior Formulation"
You get consistent cure and quality in all environments;
no uncured strips, no soft, hard or uncured spots as with
other polyureas.
• Spal-Pro RSF Comes with a "Legacy"
For 30+ years, Metzger/McGuire has been the unequaled
leader in floor joint protection technology and technical/field
services and support.
9. USDA/FDA Approval
Spal-Pro RSF is acceptable for use in floors subject to USDA and FDA inspection
and regulation. See section 19 for additional information.
10. Technical Assistance
Complete technical support and literature are available from authorized
distributors, through our web site (www.metzgermcguire.com) or by contacting our
New Hampshire headquarters at (800)223-MM80.
11. Where to Specify and File
Spal-Pro RSF is exclusively for use in concrete floors and thus should always be
referenced in 03251 (expansion/contraction joints) & 03300
(cast-in-place concrete). It is not a sealant and should not be specified
as part of 07900, other than for cross reference.
12. Quality Installation Programs
Metzger/McGuire offers quality installation assurance programs for qualified
projects. Contact Metzger/McGuire for specific information.
13. Availability
Spal-Pro RSF is available through quality construction supply distributors in
most major cities (listing available at www.metzgermcguire.com)
or through our New Hampshire headquarters.
14. Installation
The following instructions are abbreviated. Complete instructions are
provided with each shipment.
When to Install
Spal-Pro RSF should be installed only in areas below 32° F (0° C). Room
should be stabilized at final operating temperature for 24-48 hours prior to
installing Spal-Pro RSF.
Joint Preparation
Joints should be free of saw laitance, dirt, debris, frost and/or visible
moisture. Joint cleaning procedures must accomplish the removal of all of
the above. Failure to do so could compromise adhesion. Coating
and sealers must also be removed from the inner joint walls. No primer is
needed. Contact M/M if unusual conditions are suspected.
Choking off the base of the joint is normally not required due to Spal-Pro RSF's
rapid set. Applicator may at his option choke-off the shrinkage crack if
it is excessively wide (as shown in joint design spec, section 5). Do not
use compressible backer rod (Ethafoam, etc) in saw cut joints.
Prior to Dispensing
Caution: Thoroughly read MSDS and complete installation instructions prior to
opening containers or attempting to dispense.
Spal-Pro RSF must be dispensed with dual-feed power dispensing equipment, or
with pre-filled, dual-dispense cartridge convenience kits provided by
Metzger/McGuire. Manual dispensing is impractical due to short working
life (2-3 minute gel time). Power dispensing systems should be set to a
1:1 ratio by volume, with lines and material tanks heated and insulated.
Material should be maintained at a minimum temperature of 75° F (24°C) for
best results. We recommend the use of a 1/2" diameter (ID) 32 element
static mixer.
Material provided in drums or pails should be thoroughly mixed with drill and
paddle to redistribute any settlement or pigment separation that may have
occurred during shipping or storage. Cartridges should be shaken
aggressively.
Dispensing
Fill joint from bottom to top, preferably using a dispensing tip that fits into
the joint. Take care not to entrap air bubbles. Joint can be filled
using either a one or two pass technique. The RSF should overfill the
joint, leaving a crowned profile, and allowed to cure. The crown may be easily
razored off in 1 1/2 to 3 hours, leaving a profile that is flush with the
floor's surface. If RSF razoring is delayed and becomes difficult to shave
smoothly, apply a small amount of heat as you razor material off.
Should filler cure below the floor surface (due to settlement into the void at
base of joint, etc.), wipe off surface of filler with solvent and apply
additional filler. Adhesion between beads is enhanced by roughening the
surface of the first bead.
The overfill not removed during razoring may leave a slight stain on
concrete. The degree of staining will depend on the surface density (porosity)
of the slab. The stain will gradually fade as a result of subsequent
traffic and floor cleaning procedures.
Bubbles in Surface of Bead
Small bubbles may develop during the cure of the material. These are
generally due to the air entrapment. Bubbles may be "popped" by
applying a flame prior to cure. Small (pinhead, etc.) bubbles will not
adversely affect Spal-Pro RSF's performance.
Clean-Up
Spills of unmixed components can be cleaned up with solvent (Toluol, Xylol, MEK
, Denatured Alcohol, etc). Cured product can be scraped or shaved off
floor and tools.
15. Maintenance
Once cured, Spal-Pro RSF is basically maintenance free. If joints should
open wider after installation, fill the voids with additional Spal-Pro RSF.
16. Coverage
Rates
|
Joint
Size (US) LF/Gal.
1/8" x 1"
150
1/8" x 11/4"
125
1/8" x 11/2"
100
1/8" x 13/4"
85
1/8" x 2"
75
3/16" x 3/4"
135
3/16" x 1"
100
3/16" x 11/4"
85
3/16" x 11/2"
70
3/16" x 13/4" 60
3/16" x 2" 50
1/4" x 1"
80
1/4" x 11/4"
60
1/4" x 11/2"
50
1/4" x 13/4" 45
1/4" x 2"
40
1/2" x 1" 40
|
Joint
Size (Metric) M/Gal
3 x 25
46
3 x 31
38
3 x 38
30
3 x 44
26
3 x 50
23
5 x 19
41
5 x 25
30
5 x 31
26
5 x 38
21
5 x 44
18
5 x 50
15
6 x 25
24
6 x 31
18
6 x 44
14
6 x 50
12
9 x 25
15
13 x 25
12
|
17.
Shelflife and Storage
Spal-Pro RSF has a guaranteed shelf life of 180 days if containers remain
unopened. Store in dry, cool areas away from excessive heat, freeze/thaw
and sunlight. See complete installation instructions for info.
18. Safety
This product is for industrial use only. Use only in well ventilated areas.
Practice all normal jobsite safety precautions (clear work area, etc). Refer to
MSDS and installation instructions for more information.
19. Food Related Facilities
USDA prohibits the use of any chemicals in areas where existing food or food
packaging can be contaminated. See "Food Warning" in
installation instructions.
|